Award
Orange County M00000116968
BASE BID - - Maddox Electric scope of work is based on the following Inclusions, Exclusions and Clarifications. Our b...
Recipient
MADDOX ELECTRIC CO INC DBA/
Award Amount
$72,300.00
Ceiling
$72,300.00
Awarded
January 03, 2025
Identifier
M00000116968
The purchase order from Orange County, Florida, awarded to Maddox Electric Co Inc DBA, includes electrical installation services, fuse replacements, and cable testing at a total amount of $72,300. The scope covers setting up manhole gear, installing 5kv MV cables, fuse supply, and cable testing, with a construction duration of 3 days. The award was made on January 3, 2025, and involves multiple line items for electrical work, fuse replacement, and cable support. The contract emphasizes all necessary labor and materials, excluding permit fees, hardware replacement, and certain engineering drawings. The award is a single-transaction contract, with the vendor Maddox Electric Co Inc DBA receiving payment for the specified services.
Description
BASE BID - - Maddox Electric scope of work is based on the following Inclusions, Exclusions and Clarifications. Our base proposal includes all necessary labor and materials to complete the electrical work as Follows. Inclusions: 1. Set up manhole gear, Pump out 6 vaults. 2. Demo the existing 5kv cable max 900? 3. Furnish and install 900? x 3 - 1/0 5kv MV class B cable through 6 Vaults and 1 pull box. 4. Terminate new cable at gear with live and terms at each side. 5. #1 Ground to be pulled with cable 6. Fire Tape cable at each pull box and manhole 7. Supply and install 1 ? 9R 5kv fuse per #2 Adder if added to the proposal 8. Furnish and turn over 3 ? spare 9R 5kv fuses per #2 Adder if added to the proposal 9. Vacuum and Cleanup components in the cabinet covered in Plasticizer 10. Cable Testing for the new 900? Run Exclusions: 1. Permit / permit fees 2. replacement of any components or hardware in the cabinet 3. patch and painting, 4. Sign & Sealed Engineered drawings. 5. Any repairs to existing inoperable equipment, and systems that do not comply with Electrical codes, regulations, or specifications. Clarifications: 1. Price based on all work being performed on 1 st , straight time. No holiday or overtime pay included. 2. Electrical trash removal to an owner provided dumpster. 3. Based on a construction duration of (3) Days 4. Price is valid for 15 days 5. Due to the instability in the commodities markets, if in the event that, during the performance of this proposal, the p; 9R FUSES - - 9R FUSES TO REPLACE THE BAD OR DAMAGE FUSES.; CABLE TESTING AND SUPPORT - - CABLE TESTING AND SUPPORT. JUSTIFICATION: ERWSF - THE LOW VOLTAGE LINES FROM BUILDING 80 TO BUILDING 20 NEED TO BE REPLACE DUE DAMAGE. QUOTE DATED 12/18/2024 POC: ROBERT RODRIGUEZ / PH (407) 254-9536 PR # 513301