Award
Los Angeles County Internal Services Department PO-IS-26007333
Annual Inspection and Maintenance of 4 Fulton Thermal Heaters and SteamPacs by Fulton Pacific Equipment Pacific, LLC
Recipient
FULTON PACIFIC EQUIPMENT PACIFIC, LLC
Award Amount
$44,686.00
Ceiling
$44,686.00
Awarded
January 14, 2026
Identifier
PO-IS-26007333
This purchase order from Los Angeles County Internal Services Department (California, US) to Fulton Pacific Equipment Pacific, LLC covers a comprehensive annual inspection and maintenance service for four Fulton thermal fluid heaters and SteamPacs, including labor, materials, and freight. The contract, awarded on January 14, 2026, involves detailed scope of work such as lockout/tagout procedures, burner removal, internal refractory inspection, cleaning, control testing, and operator training, performed during normal business hours by Fulton factory technicians. The total awarded amount is $44,686, with specific line items for labor, materials, and freight, indicating a single-transaction procurement with a focus on thermal system upkeep.
Description
LABOR Annual Inspection and Maintenance of (4) Fulton Thermal Heaters and SteamPacs, NB#?s 7514, 7475, 7427, 7369 Scope of work -Thermal Fluid Heaters -Lockout & Tagout Heater. -Remove Burner for inspection, clean as needed. -Inspect Heater Internal Refractory. -Remove Pilot for inspection, clean as needed. -Remove Electrode for inspection, clean as needed. -Reinstall Burner with new gaskets. -Inspect Combustion Air Fan, clean as needed. -Inspect for Fluid leaks. -Inspect and test control devices (low level switch, hi/lo gas pressure switches, inlet/outlet/diff. pressure switches, temp/firing rate controls, hi limit cutoff) -Start-up and set combustion for best compliance and efficiency. -Provide basic operator training as needed. -Submit work order and combustion report to customer. Thermal Fluid DAH -Lockout & Tagout Pumps. -Inspect thermal fluid pumps for leaks. -Inspect Pump Strainers, clean as needed, reinstall with new gaskets. -Check alignment of thermal fluid pumps Adjust alignment as needed to maintain manufacturer specification. -Perform base line vibration analysis on thermal fluid pump(s). -Check torque settings on pump mount bolts -Submit work order to customer. SteamPacs -Lockout & Tagout SteamPac. -Open for inspection, clean and flush as needed, close with new gaskets. -Remove and replace gauge glass and gaskets. -Inspect level controls, clean as needed, reinstall with new gaskets. -Inspect and test control devices (low level switch, operating controls, hi limit cutoff) -Inspect DA and Surge Pump Strainers, clean as needed, reinstall with new gaskets. -Check for fluid leaks. -Submit work order to customer. Work to be performed during normal business hours (M-F) by authorized Fulton Factory Technicians. QUOTE #2025FEP-1025 REQUESTOR: ENRIQUE ALCALA 424-210-2581; MATERIAL; FREIGHT