Award
McAllen 11-17-C05-273
MAIN DISTRIBUTION FRAME (MDF) ROOM RENOVATION – LIEBERT CRAC SYSTEM REPLACEMENT (RE-BID)
Recipient
Not Specified
Awarded
December 11, 2017
Identifier
11-17-C05-273
Award for renovation of the MDF room involving replacement of CRAC systems and related HVAC and structural work.
Description
Renovation work in the main MDF room on the second floor including removal of existing 10-ton Stulz CRAC unit, installation of two new 12-ton Liebert CRAC systems outside the MDF room, directing supply air into the plenum under the raised floor and return from above the ceiling, building a sound-insulated room for the unit, mounting condensers on the roof, installing new refrigerant lines, refurbishing fire suppression system, and ceiling removal and painting.