McAllen 11-17-C05-273

MAIN DISTRIBUTION FRAME (MDF) ROOM RENOVATION – LIEBERT CRAC SYSTEM REPLACEMENT (RE-BID)

Recipient

Not Specified

Awarded

December 11, 2017

Identifier

11-17-C05-273

Award for renovation of the MDF room involving replacement of CRAC systems and related HVAC and structural work.

Description

Renovation work in the main MDF room on the second floor including removal of existing 10-ton Stulz CRAC unit, installation of two new 12-ton Liebert CRAC systems outside the MDF room, directing supply air into the plenum under the raised floor and return from above the ceiling, building a sound-insulated room for the unit, mounting condensers on the roof, installing new refrigerant lines, refurbishing fire suppression system, and ceiling removal and painting.