Award

Guilford County NC MUNIS #20208

Roof Replacement at the High Point Detention (IFB)

Recipient

Triad Roofing Company, Inc.

Award Amount

$491,500.00

Ceiling

$491,500.00

Awarded

June 17, 2024

Identifier

20208

The government buyer is Guilford County Facilities, specifically for the High Point Detention Center located at 507 East Green Drive, High Point, North Carolina. The contract involves roof replacement services at this detention center. The structural design and architectural services are provided by R. Tad Furrow, PE, based in Winston-Salem, NC. The awarded work includes removal of existing roofing materials such as ballast, roof membrane, and insulation, installation of new tapered polyisocyanurate (polyiso) insulation totaling three inches, fully adhered fleece-backed PVC reinforced thermoplastic membrane roofing system, gypsum-based cover boards, flashing, and related roof details. The contract specifies detailed roof plans and sections for various roof areas including main roof, penthouse roof, and second-floor roofs. Notable contract requirements include maintaining building occupancy during construction with pedestrian and vehicle protection, security checks due to the detention facility nature, and coordination with mechanical and electrical contractors for HVAC equipment disconnection and reconnection. The roofing system must be watertight with heat-welded membrane flashings, and includes provisions for lightning protection system continuity. The place of performance is the High Point Detention Center at the specified address in Guilford County, North Carolina. The contract emphasizes compliance with 2018 North Carolina building codes and fire protection requirements. No specific OEMs or vendors other than R. Tad Furrow, PE are mentioned. The period of performance details are not explicitly stated in the text provided.

Description

Roof Replacement at the High Point Detention Center. The contractor is to provide all required labor, tools, materials, and equipment for the removal of the existing ballasted EPDM roofing system and insulation to the concrete deck. Installation of a fully adhered insulation system and fully adhered thermoplastic roof membrane with required flashings.

View original record