Award

Kern County 2406818

All labor, material, and equipment required to replace HVAC 4-Ton Rooftop Unit at Kern County Fire Station 61 per quo...

Recipient

Johnson Controls

Award Amount

$12,610.57

Ceiling

$12,610.57

Awarded

November 07, 2023

Identifier

2406818

Kern County awarded Johnson Controls a purchase order to replace one 4-ton, 3-phase, 208/230V rooftop gas package HVAC unit at Fire Station #61. The work includes removal and disposal of the existing unit and refrigerant in accordance with EPA guidelines; sheet-metal duct transitions; installation of a disconnect switch and fuses; reconnection of gas, condensate, and existing controls; crane and rigging; hoisting; startup and operational checks. The new unit uses R-410a refrigerant. The order lists equipment/materials, truck charges (3 hours at $50/hour), crane/rigging, labor, and taxes, with line amounts of $9,507.47, $2,400.00, and $703.10. Work is subject to Price Agreement 1215; the stated lump sum includes materials, equipment, insurance, permits, and prevailing wage. The incorporated quote is dated September 22, 2023.

Description

All labor, material, and equipment required to replace HVAC 4-Ton Rooftop Unit at Kern County Fire Station 61 per quote dated September 22, 2023 and incorporated herein by reference. Work to be performed in conformance with Price Agreement 1215. Equipment, Materials $8,522.47 Truck Charge 3hr @ $50.00 $150.00 Crane/Rigging $835.0 Total: $9,507.47 Location: Fire Station #61 6400 Fruitvale Ave Bakersfield, Ca. 93308 Scope of Work: Quote Inclusions: Disposal of old equipment, recover and dispose of refrigerant as per EPA guidelines Remove existing controls, gas line and condensate line from unit. Rig off existing unit from roof. Provide and install (1) new 4-ton 3-phase 208/230v Rooftop Gas Package Unit Provide and install sheet metal transitions to connect new equipment to existing ducting New unit to utilize R-410a refrigerant Provide and install new unit disconnect switch and fuses Reconnect gas line to new unit and pipe in as necessary Reconnect condensate line to new unit and pipe in as necessary Reconnect existing controls to new unit for proper operation Hoisting and rigging of new equipment Startup and operational check Labor at normal weekday rates, parts, crane/rigging, tax and freight are included Lump sum total includes all materials, equipment, insurance, permits, and prevailing wage.; LABOR; Taxes (Equipment, Material only)