Orange County M00000120359
Project: Construct an interior room within Fire Station 53 and install a window as part of the build. Job Address: 12...
Recipient
MCFARLANE CONSTRUCTION GROUP
Award Amount
$34,380.00
Ceiling
$34,380.00
Awarded
January 23, 2026
Identifier
M00000120359
The Orange County county government in Florida awarded a contract to McFarlane Construction Group for constructing an interior room and installing a window at Fire Station 53 located at 1270 La Quinta Drive, Orlando. The project scope includes permits and fees, CMU block work, electrical tenant improvements, HVAC upgrades, drywall, door, and window installation. The contract amount is $34,380, awarded on January 23, 2026, and is a single-transaction purchase. The procurement involved detailed scope of work with specific construction and mechanical tasks, and the award is part of a construction project for a municipal fire station.
Description
Project: Construct an interior room within Fire Station 53 and install a window as part of the build. Job Address: 1270 La Quinta Drive, Orlando, Florida 32809 SCOPE OF WORK: Item: Permits & Fees Description: All NOC, building application, permits, and fees included. Item: CMU Block Work Description: Cut existing CMU, install lintel as needed, frame and install egress window. Item: Electrical Tenant Improvement / HVAC Description: Run (2) homeruns to exterior of building for (2) whips/ quick disconnects. Install 4' led light fixture and switch to newly created server room w/ switch. Relocate sensor switch in bunk room for proper motion pickup. Relocate junction box on wall away from new framing for wall. Item: Mechanical Improvements Description: Two (2)19 Series 24,000 BTU mini split Two (2) Wall mounted 19 Series HP Mini Splits Install copper linesets w/ lineset plastic bottom Contractor to install wall penetration cover (Starter Piece) Hurricane Slab 18x40x4 (If determined required) Relocate and install supply and return in bunk room Item: Drywall, Door, Window Installation Description: Close an existing door opening. Construct two new wall, each to enclose the panel area. Install new batt insulation to reduce sound. Create a new door opening within the new walls to allow access to the panels. Additionally, frame out and finish new window opening. Work includes framing, drywall installation, finishing, and texture matching to blend with surrounding surfaces. Contract