Award

Division of Facilities Construction and Management DA23017

DFCM Construction-Pre-qualified Mechanical-Snow T&I Bldg. RTU and Heating HW Pipe-23044700/23233700

Recipient

Tod R Packer Heating and Air Conditioning

Award Amount

$909,690.00

Ceiling

$909,690.00

Awarded

January 05, 2023

Identifier

DA23017

The State of Utah - Division of Facilities Construction and Management (DFCM) awarded a construction contract to Tod R Packer Heating and Air Conditioning for the replacement of the rooftop air handler and hot water piping at Snow College in Ephraim, Utah. The project involves removing and replacing the rooftop air handler and all existing hot water supply and return piping throughout the Trades & Industries Building, excluding the boiler room. The total awarded amount is approximately $909,690. The work must be completed by the end of April for the air handler and maintained throughout winter for piping. The project is identified by DFCM project numbers 23044700 and 23233700. The location is Snow College, Ephraim, Utah, in Sanpete County. The award was made to pre-qualified firms, with the primary vendor being Tod R Packer Heating and Air Conditioning. The contract includes nonresidential building construction, HVAC, electrical, and mechanical services. The project period of performance is unspecified, but completion is targeted for June 23, 2023. The procurement involved multiple vendors, including Commercial Mechanical Systems & Service LLC and Combustion and Control Service LLC, with respective bid amounts of approximately $1,021,158 and $1,129,000. The primary contact for the award is Tod R Packer, with email and phone details provided.

Description

The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the Trades & Industries Bldg. Roof Top Air Handler Replacement and Heating Hot Water Pipe Replacement at Snow College, Ephraim, Utah. The project involves removing and replacing the Roof Top Air Handler and replacing all existing hot water supply and return piping throughout the building except the Boiler room. The construction cost estimate is $520,000.00. Only firms pre-qualified during Stage I of the RFS are allowed to bid. A mandatory pre-bid meeting was held on August 30, 2022. The combined total of both projects will be awarded to the low bidder.

View original record