Award
City of Los Angeles Department of Public Works PO-PW-26008740
ROUND TRIP TRANSPORTATION, INSTALLATION, STARTUP, INSTRUCTION & REMOVAL LABOR SCOPE OF WORK - STAGE/DELIVER EQUIPMENT...
Recipient
TOTAL ENVIRONMENTAL MANAGEMENT
Award Amount
$25,335.00
Ceiling
$25,335.00
Awarded
June 05, 2026
Identifier
PO-PW-26008740
The City of Los Angeles Department of Public Works awarded a contract to Total Environmental Management for a comprehensive scope of work including transportation, installation, startup, instruction, and removal of a fluid cooler trailer at a specified jobsite. The contract covers one month of equipment rental, overtime installation, and a lift service, with a total obligated amount of $25,335. The award was made on June 5, 2026, and involves multiple line items with detailed scope and contact information. The procurement is categorized under the public works department, and the location is Los Angeles, California, USA.
Description
ROUND TRIP TRANSPORTATION, INSTALLATION, STARTUP, INSTRUCTION & REMOVAL LABOR SCOPE OF WORK - STAGE/DELIVER EQUIPMENT AND MATERIAL TO JOBSITE. - PARK FLUID COOLER TRAILER IN DESIGNATED LOCATION. - PROVIDE AND INSTALL TEMPORARY HEADER/MANIFOLD TO CUSTOMER PROVIDED POINT OF CONNECTIONS. - FURNISH AND INSTALL TEMPORARY FLEXIBLE HOSE FROM TEMP FLUID COOLER TO TEM PROVIDED HEADER/MANIFOLD. - PROVIDE AND INSTALL TYPE W UL RATED TEMPORARY POWER CABLE FROM TEMPORARY UNIT TO CUSTOMER PROVIDED POWER SOURCE. - FURNISH AND INSTALL TEMPORARY FLEXIBLE MAKE-UP WATER HOSE FROM CUSTOMER PROVIDED WATER SOURCE TO TEMPORARY SYSTEM. - FURNISH AND INSTALL TEMPORARY FLEXIBLE BLOW-DOWN WATER HOSE FROM CUSTOMER PROVIDED DRAINAGE SOURCE TO TEMPORARY SYSTEM. - AFTER COMPLETION OF INSTALLATION, TEM WILL FILL THE SYSTEM, START THE SYSTEM, AND PROVIDE OPERATOR INSTRUCTION. - DURING THE RENTAL PERIOD, TEM WILL PROVIDE ROUTINE MAINTENANCE INSPECTIONS. SCHEDULING IS BASED ON TEM SERVICE DEPARTMENT'S DISCRETION. - WATER TREATMENT WILL BE PROVIDED BY A TEM THIRD PARTY CHEMICAL TREATMENT CONTRACTOR FOR TEM PROVIDED EQUIPMENT. TEM IS NOT RESPONSIBLE FOR BUILDING SYSTEM. - AT THE CONCLUSION OF THE PROJECT, TEM WILL REMOVE ALL TEM FURNISHED EQUIPMENT. PROPOSAL # 1260383R CONTACT: EVELYN HA; FACM; (626) 458-7359; OVERTIME INSTALLATION; LIFT; EQUIPMENT RENTAL ONE MONTH RENTAL REFERENCE VENDOR: TOTAL ENVIRONMENTAL MANAGEMENT 1415 N BURTON PL ANAHEIM, CA 92806 MARK PICKERING 714-678-3300 MARKP@TEMCOOL.COM PRIOR REQ: N/A PRIOR PO: N/A REQ: 630010 FUND: B04 UNIT:47760 OBJECT: 2672