Award
Orange County M00000116314
(1) New Weiler P285 Tracked Paver CONTRACT DETAILS: Sourcewell Contract #060122-WLR BASE MACHINE (1) P285-002 Weiler ...
Recipient
RING POWER CORPORATION
Award Amount
$260,381.00
Ceiling
$260,381.00
Awarded
November 04, 2024
Identifier
M00000116314
This purchase order documents Orange County, a county government in Florida, awarding Ring Power Corporation a contract for a Weiler P285 Tracked Paver under Sourcewell Contract #060122-WLR. The order includes a base machine with various optional components and accessories, totaling an obligated and award amount of $260,381. The procurement was finalized on November 4, 2024, and involves detailed specifications for the equipment, including multiple optional features and control systems. The contract appears to be a single-transaction order for a capital equipment purchase, with no indication of a multi-year or blanket arrangement.
Description
(1) New Weiler P285 Tracked Paver CONTRACT DETAILS: Sourcewell Contract #060122-WLR BASE MACHINE (1) P285-002 Weiler P285 8' Tracked Paver - $197573.00 (1) CATERPILLAR 2.8 TIER IV ENGINE, 74 HP - $0.00 (1) 125MM TRACK GROUP w/ 12" POLY PADS - $0.00 (1) HIGH OR LOW DECK OPERATING POSITIONS - $0.00 (1) JOYSTICK OR INT STEERING WHEEL CONTROLS - $0.00 (1) LH/RH CONTROL STATIONS - $0.00 (1) SPEED AUGER SYSTEM, UNDER AUGER CUTOFF DOORS - $0.00 (1) 12" NIHARD AUGER SEGMENTS, CENTER CHAIN GUARD (1) HIGHWAY CLASS CHAINS & BEARINGS (1) 2" X 26" CONVEYER TUNNELS W/ NO UNDER PLATES - $0.00 (1) REMOTE GREASE LINES, DUAL COLOR DISPLAYS - $0.00 (1) 7'8" TO 15' PAVING WIDTHS, 3/8" AR400 SCREED PLATES - $0.00 (1) REMOTE GREASE LINES, DUAL COLOR DISPLAYS - $0.00 (1) 7'8" TO 15' PAVING WIDTHS, 3/8" AR400 SCREED PLATES (1) ELECTRIC SCREED HEAT - $0.00 (1) SPRAY DOWN SYSTEM W/ SEPARATE TANK - $0.00 (1) P285-250 - ELECTRIC SCREED 7'8" TO 15' PAVING WIDTH - $42,008.00 (1) P285-601 - ENGLISH LANGUAGE - $367.00 (1) P285-100 - ADDITIONAL OPERATOR'S SEAT GROUP - $1,125.00 (1) P285-100 - SECOND STEERING INDICATOR GROUP - $202.00 (1) P285-118 - HANDHELD REMOTE GROUP '(2) - $1,780.00 (1) P285-150 - SCREED MOUNTED CONTROL PANELS - $2,758.00 (1) P285-210 - TOPCON PAVER PREP GROUP - $1,200 (1) P285-300 - POWER EXTENDER HEIGHT - $2,813.00 (1) P285-301 - POWER SLOPE ADJUSTMENT - $5,579.00 (1) P285-214 - TOPCON P-32 DUAL GRADE W/ SLOPE GROUP - $22,905.00 (1) P285-060 - WEILER UMBRELLA GROUP -