Award

City of Sebastian MyVendorLink #FKEC BID #26-03

SPECIFICATIONS FOR CONSTRUCTION OF A NEW ELECTRIC DISTRIBUTION FEEDER

Recipient

TRAVOLT LLC

Awarded

March 16, 2026

Identifier

FKEC BID #26-03

The Florida Keys Electric Cooperative (FKEC) awarded a contract to TRAVOLT LLC for the construction of a new electric distribution feeder, designated as the Q Feeder, between Crawl Key and Marathon substations in Florida. The project involves rebuilding and reconductoring 1.5 miles of 25 kV overhead distribution line and 3.5 miles of underground feeder along US1/Overseas Highway, including installation of underground cables, vaults, and poles, with minimal outage times. The scope includes working on energized conductors, installing new poles, transferring existing loads, and removing old infrastructure, all in accordance with FKEC's engineering drawings and industry standards. The project aims to enhance reliability and connectivity between the substations, with completion anticipated by the end of 2027.

Description

Florida Keys Electric Cooperative awarded the contract for the construction of a new electric distribution feeder (FKEC BID #26-03) to TRAVOLT LLC. The project involves rebuilding and reconductoring 1.5 miles of 25kV three-phase overhead distribution feeder and 3.5 miles of underground feeder from Crawl Key to Marathon substation. The award was announced on March 16, 2026.

View original record