Award

Orange County M00000118420

Boiler room system, to include furnish and setup of boiler room, internal fuel tank, boiler system housing, delivery ...

Recipient

INDUSTRIAL ENGINEERING CO INC

Award Amount

$244,150.00

Ceiling

$244,150.00

Awarded

June 13, 2025

Identifier

M00000118420

The Orange County county government in Florida awarded a contract to INDUSTRIAL ENGINEERING CO INC for a boiler room system, including furnish and setup, internal fuel tank, boiler system housing, delivery FOB destination, placement, leveling, removal, transport return, and associated components such as feedwater system, pre-heat system, water softener, blowdown system, and fuel train. The contract covers the supply of 1 steam boiler room system, labor for installation, inside steam and condensate line runs, and boiler system teardown. The total obligated amount is $244,150. The award was made on June 13, 2025, and the awardee is located in Orlando, Florida. The procurement involved multiple line items with specific quantities and unit prices, and the contract includes fixed hourly rates for labor and lump sum for equipment and teardown.

Description

Boiler room system, to include furnish and setup of boiler room, internal fuel tank, boiler system housing, delivery FOB destination, placement, leveling, removal and transport return, and include associated boiler room components of feedwater system, pre-heat system, water softener, blowdown system, fuel train, as a lump sum, complete. 1 Steam Boiler Room System; Boiler system labor, to include all labor for boiler room system outside connections, setup, pre-show testing, and in-show operation, and monitoring, at a fixed rate per hour (no over time paid); Inside steam and condensate line runs, to include all materials and supplies for inside steam hose AND condensate line runs. Each "Run" includes steam hose and condensate line, as a singular measured distance, from OCCC floor box to exhibitor's intake manifold or pressure regulator, using hose of up to 2" diameter for steam runs of 30-foot length or less, per run.; Inside steam and condensate lines, to include all materials and supplies for inside steam hose AND condensate line runs. Each "Run" includes steam hose and condensate line, as a singular measured distance, from OCCC floor box to exhibitor's intake manifold or pressure regulator, using hose of up to 2" diameter for steam runs of Over 30-foot length, per run.; All labor necessary to install all steam and condensate line runs as described in Item #3 and #4. Unit price shall be at a fixed rate per hour (no overtime paid.); Boiler system teardown, include all labor, materials and supplies for boiler system teardown, dismantle, line drain, nitrogen charge, removal and restore site, as a lump sum complete. Costs for all other or miscellaneous items not otherwise specified shall be included in price quote for item #7. Quote dated 5/16/2025 OCCC Contact John Schmidt 407-685-5822