United Independent School District Ionwave #JOC 001-2021 Addendum 3

JOC 001-2021 Addendum 3 (Bonnie Garcia Elementary School Drainage System Upgrade)

Recipient

Leyendecker Construction of Texas, Inc.

Award Amount

$116,500.00

Ceiling

$116,500.00

Awarded

January 14, 2021

Identifier

JOC 001-2021 Addendum 3

The United Independent School District (UISD), located in Laredo, Texas, awarded a contract to Leyendecker Construction of Texas, Inc. for the drainage system upgrade at Bonnie Garcia Elementary School. The contract involves installation of storm drain pipes, junction boxes, grate inlets, concrete riprap, header curbs, and stormwater pollution prevention measures. The project includes trenching, excavation, backfilling, and utility coordination, with a total awarded amount of $116,500. The scope encompasses demolition of existing infrastructure, utility adjustments, and site restoration, adhering to local, state, and federal safety and environmental regulations. The period of performance is from March 8, 2021, to June 21, 2021. The buyer is the United Independent School District, and the awardee is Leyendecker Construction of Texas, Inc. The project site is at Bonnie Garcia Elementary School in Laredo, Texas. Key products include 24-inch storm drain pipes, 18-inch PVC pipes, and associated structures. The award falls under the category 'k12'. Contact for procurement is Ms. Karina Mendoza Guerra, Purchasing Manager, with email kmendoza@uisd.net. Likely competitors include American Contracting & Roofing, Hellas Construction, QuantumConstruction, Romo Contractors, Summit Building & Design, Sunbelt Air Conditioning & Refrigeration Services, Inc., and Zertuche Construction, LLC.

Description

Job Order Contract awarded for the Bonnie Garcia Elementary School Drainage System Upgrade project. The awarded contractor is Leyendecker Construction of Texas, Inc. The contract involves drainage system upgrades including installation of storm drain pipes, removal and disposal of existing pipes, excavation, embankment, subgrade preparation, concrete riprap placement, curb installation, and storm water pollution prevention measures. The contract amount awarded is $116,500.00.

View original record