Award
Rancho California Water District Planet bids #RFB 239-2025
Seven (7) Booster Vertical Turbine Pump Assemblies
Recipient
Not specified in the source
Awarded
January 22, 2026
Identifier
RFB 239-2025
The Rancho California Water District awarded contracts for the furnishing, assembly, delivery, and inspection of seven NSF-61 compliant booster vertical turbine pump assemblies across various booster stations. The awards include detailed specifications for each pump, such as flow rates, head, motor horsepower, and materials, with associated services like startup attendance and warranty support. The projects involve multiple locations including Norma Marshall, Bear Creek, De Portola, Buck Mesa, Rancho Cal, Ace Bowen, and Cal Oaks booster stations. The procurement emphasizes strict compliance with hydraulic, dimensional, material, and NSF standards, with delivery lead times ranging from 6 to 8 weeks. The contracts also specify warranty terms, installation responsibilities, and detailed technical and engineering requirements.
Description
Rancho California Water District awarded a contract for furnishing, assembly, and delivery of seven new NSF-61 compliant short-set booster vertical turbine pump assemblies across multiple booster station sites. Installation will be performed by District personnel, with the contractor attending startup procedures and testing for warranty verification. The pumps are critical to the District's groundwater production and distribution system, requiring strict compliance with hydraulic, dimensional, material, and NSF 61 standards. The assemblies must be fully inspected and tested prior to delivery, with contractor-provided as-built drawings and CAD files approved before fabrication and shipment.