Award

La Crosse Questcdn #2823162

2013 Main Street Reconstruction-From 20th St to 17th St

Recipient

Steiger Construction Inc.

Award Amount

$224,633.00

Ceiling

$224,633.00

Awarded

August 06, 2013

Identifier

2823162

The City of La Crosse Engineering Department is the government buyer for the 2013 Main Street Reconstruction project covering 17th Street to 20th Street. The awarded contract involves extensive street reconstruction work including installation and removal of concrete curbs, gutters, sidewalks, and pavements, as well as asphalt base and surface courses, detectable warning fields, manhole adjustments, boulevard restoration, erosion control, and temporary traffic control. The vendors/bidders mentioned include McHugh, Pember, and Steiger. The awarded products and services include various concrete works such as Concrete Curb & Gutter (including 6" base), Concrete Gutter Section, 9" Concrete Pavement, 7" Concrete Pavement including alley approaches, 6" Concrete Pavement including driveway approaches, 6" and 5" Concrete Sidewalks including pedestrian ramps, 4" Concrete Sidewalk standard residential, Detectable Warning Field (unpainted cast iron), Bituminous Asphalt Base Course, Bituminous Concrete Surface Course, Tack Coat, manhole adjustments with city-supplied castings, boulevard restoration and lawn establishment (including black dirt, seeding, fertilizer, and mulching), erosion control, temporary traffic control, and removal of various concrete and asphalt pavements and sawings. Quantities for these items range from small units (e.g., 1 EA for manhole adjustment) to thousands of linear feet or square yards (e.g., 1900 L.F. Concrete Curb & Gutter, 5600 S.Y. Remove Bituminous Asphalt Pavement). The contract estimate is approximately $310,000.00. Unique contract requirements include the use of city-supplied castings for manhole adjustments and specific restoration standards for boulevard and lawn establishment. The project location is within the City of La Crosse, Wisconsin.

Description

The project involves reconstruction of Main Street from 20th St to 17th St. The bid was due on August 6, 2013. The project was awarded to Steiger Construction Inc. for $224,633. Other bidders included Pember Companies, Inc. and McHugh Excavating & Plumbing, Inc.

View original record