Kern County 2406204
All labor, material, and equipment required to replace Tandem Compressors, per quote SQ: 33456 dated 8-1-2023 and inc...
Recipient
Mesa Energy Systems, Inc. dba EMCOR SERVICES MESA ENERGY
Award Amount
$22,333.38
Ceiling
$22,333.38
Awarded
August 10, 2023
Identifier
2406204
Kern County contracted Mesa Energy Systems, Inc. dba EMCOR SERVICES MESA ENERGY to provide labor, materials, and equipment to replace tandem compressors at JTF, 17284 Quality Road, Bakersfield, California. Work includes installing two compressors, two contactors, two CFMs, and two filter driers for circuit 2; refrigerant recovery and disposal; leak testing, electrical reconnection, vacuuming, and startup and operational checks. The system requires 43 lbs of customer-supplied R-407c refrigerant. EMCOR provides the crane and rigging needed for the 258-lb compressors. The $22,333.38 lump sum includes labor, materials, tax, shipping, crane rigging, insurance, and prevailing wage. Exclusions include engineering, permits and fees, structural upgrades, new controls or fire/life-safety work, electrical-capacity upgrades, roofing and related repair work, and abatement. The description specifies normal and overtime hours but also states work is to be performed during normal business hours.
Description
All labor, material, and equipment required to replace Tandem Compressors, per quote SQ: 33456 dated 8-1-2023 and incorporated herein by this reference. Location: JTF 17284 Quality Road Bakersfield, Ca 93308 Scope of Work • LOTO the unit. Perform zero voltage verification. • Recover the refrigerant & dispose of it in accordance with state & local regulations. • Disconnect the electrical to the compressors, CFMs & contactors for circuit 2. • Provide & install (2) new compressors, (2) new contactors, (2) new CFMS & (2) new filter driers for circuit 2. • Perform a leak test on the welds. • Reattach electrical connections to the compressor, CFMs & contactor. • Pull the vacuum on the system. • Install (43) lbs of new clean R-407c refrigerant. (Customer supplied). • Remove LOTO. Perform start-up and operational checks on the unit. • Due to the weight of the compressors (258) lbs a crane will be required to perform the lift. • Emcor to provide crane & rigging. • All work to be performed during normal & overtime hours. Exclusions: • Materials or scope not specifically indicated above is excluded. • Engineering, Plans, Permits and/or fees. • Structural upgrades. • New controls and/or Fire / Life / Safety. • Scope assumes existing electrical panel, breaker, wire & disconnect have enough capacity to power new equipment. • Roofing, Cutting, painting, framing, or patching. • Abatement. • All work to be performed during normal business hours Labor-$ 6,069.00 Material-$12,247.00 Tax-$ 1,010.38 Shipping- $ 507.00 Crane Rigging - $2,500.00 Total- $ 22,333.38 Lump sum total includes all tax, insurance, and prevailing wage.