City of Los Banos #Construction of K Street Storm Drain Improvements

Construction of “K” Street Storm Drain Improvements

Recipient

D.A. Wood Construction Inc.

Award Amount

$1,328,522.00

Ceiling

$1,328,522.00

Awarded

June 13, 2017

Identifier

Construction of K Street Storm Drain Improvements

The City of Los Banos, California, awarded a construction contract to D.A. Wood Construction Inc. for the K Street Storm Drain Improvements project. The project involves furnishing and installing approximately 3,767 linear feet of storm drain line, constructing 16 manholes, 35 catch basins, 31 ADA curb ramps, and performing pavement repairs within the city. The contract includes detailed specifications for storm drain pipes (SDR-35 and SDR-26 PVC pipes), manholes, catch basins, fire hydrant assemblies, water service relocations, and surface improvements such as asphalt paving, curb and gutter, sidewalks, and pavement markings. The work is scheduled for completion within 60 working days, with a contract amount of $1,328,522. The project is managed by the City of Los Banos Public Works Department, located in Merced County, California. The contract documents specify compliance with California prevailing wages, contractor registration, bonds, and insurance requirements. The project plans and specifications are publicly available, and the bid opening occurred on June 13, 2017. The contract emphasizes utility coordination, safety, environmental compliance, and restoration of disturbed surfaces.

Description

Contract for the construction of storm drain improvements on K Street in Los Banos, California. The work includes furnishing and installing approximately 3,767 linear feet of storm drain line, constructing 16 manholes, 35 catch basins, 31 ADA curb ramps, and pavement repairs. The contract completion time is sixty (60) working days. Bids were opened on June 13, 2017, with D.A. Wood Construction Inc. awarded the contract at $1,328,522.00.

View original record