# Los Angeles County Internal Services Department PDPP-IS-27005239

LABOR SPH Retaining Wall Erosion Control GMT There are bad road conditions at GMT and Landsco will fix the roads we w...

**Recipient:** LANDSCO INC

**Award Amount:** $18,050.00
**Ceiling:** $18,050.00

**Awarded:** October 02, 2026

**Identifier:** PDPP-IS-27005239

Los Angeles County Internal Services Department (canonical buyer; raw department name: Internal Services Dept) awarded purchase order PDPP-IS-27005239 to LANDSCO INC for a total of $18,050. The order includes four lines, each with quantity 1: retaining-wall/road erosion-control labor ($5,300); pavers, gravel, and dirt ($3,850); French-drain installation labor ($6,400); and gravel, pipe, and fabric materials ($2,500). The road work addresses poor conditions along a 2.6-mile access road; the narrow road requires two S550 skid steers to allow traffic to pass, while protecting existing metal boxes and pipes. The French drain is approximately 60 feet long and uses 4-inch perforated pipe, weed fabric, and approximately 5 yards of fresh gravel to reduce water contact with the facility foundation. The source estimates the road work at about two weeks, but this is a single purchase order with no stated contract term. Invoices must be submitted to ISDinvoiceSubmission@isd.lacounty.gov, and the purchase order number must appear on invoices and packing slips. The requestor is Jason Jacks.

### Description

LABOR SPH Retaining Wall Erosion Control GMT There are bad road conditions at GMT and Landsco will fix the roads we will make sure to keep the metal boxes and any pipes intact while working these roads. There are 2.6 miles from the beginning of the road to the site. This road is narrow therefore we would be using two s550 skid steers to let any traffic pass if need be, this road is too small for larger equipment. This work should take about two weeks to complete give or take. REQUESTOR: JASON JACKS *****NOTE***** Please submit invoices to ISDinvoiceSubmission@isd.lacounty.gov for processing. Please ensure our purchase order number is referenced on all invoices and packing slips.; Pavers, gravel, dirt; LABOR SPH French Drain Landsco will install a French drain behind facility foundation and out the front gate to prevent water from making contact. The length is approximately 60 feet. We will use 4 inch perforated pipe and several layers of weed fabric so that sediment or weed roots will not clog the perforated pipe. We will need to remove some dirt and we can spread it on the grounds. We can use some of the existing gravel however it is better we use fresh gravel so that there is no pre existing sediment that can clog the pipe. This drain will need approximately 5 yards of gravel. There is a diagram that I added to this proposal we may not use exact measurements in diagrams yet this will be a reference of what we will mirror.; Gravel, Pipe, Fabric ect.
