Award

Orange County M00000117769

Scope of Work for Fire Station 33 Tuff Shed: Item: TMCG $5,000 Description: TMCG - administrative/ project supervisio...

Recipient

MCFARLANE CONSTRUCTION GROUP

Award Amount

$63,423.00

Ceiling

$63,423.00

Awarded

March 21, 2025

Identifier

M00000117769

The Orange County county government in Florida awarded a contract to McFarlane Construction Group for a comprehensive scope of work related to Fire Station 33 Tuff Shed. The procurement includes architectural plans, utility locating, electrical work, asphalt cutting, termite treatment, concrete foundation, purchase and installation of a gear shed, and gear rack system. The total obligated and award amount is $63,423. The contract was awarded on March 21, 2025, and involves multiple detailed construction and installation tasks with specific vendor companies involved in each component.

Description

Scope of Work for Fire Station 33 Tuff Shed: Item: TMCG $5,000 Description: TMCG - administrative/ project supervision Item: Bloodhound Utilities Locator $1,080 Description: locating services of possible private utility lines. Item: Architectural Plans $2,500 Description: Architectural drawings w/ foundation & site plan. Item: Permit & Fees $2,500 Description: Permit, building application, Notice of Commencement and all applicable plans, documents, and fees. Item: Electrical Work $7,380 Description: Run 20-amp 120V circuit to shed. run PVC pipe from electrical room surface mount to enter side wall to outside above door. LB PVC outside and down wall underground 12 foot to shed. Install panel box with ground rod. Install OP speed control and exhaust fan, (2} switches, (5) LED lights, (2) GFCI receptacles on each side of door and cut in vent in back of the unit. Run shed with 12x2 wire. permit included. Item: Asphalt Cutting $2,000 Description: Cut approx. 13'x15' section of asphalt roadway currently used as employee parking. Item: Termite Treatment $950 Description: Implement termite spray alter forming and prior to 6 mil visqueen installation. Item: Concrete Foundation $7,630 Description: Concrete pad approx. 13'x25'; 3000 psi w/ 8"x8" footer with no. 5 rebar. Item: Tuff Shed $13,735.36 Description: Purchase & installation of gear shed. Item: Mallory Gear Racks System $11,471.75 Description: Order, manufacture and schedule delivery of new gear racks. Item: Mounting