Award

Orange County M00000118067

Purchase order issued for the coordination, procurement, permitting, and installation of the protective gear storage ...

Recipient

HIGH STANDARD CONSTRUCTION INC

Award Amount

$61,176.00

Ceiling

$61,176.00

Awarded

April 22, 2025

Identifier

M00000118067

The purchase order was issued by Orange County, a county government in Florida, for the construction and installation of a protective gear storage shed at Fire Station 36 located at 12252 Winter Garden Vineland Road, Orlando, Florida. The vendor awarded is HIGH STANDARD CONSTRUCTION INC. The project includes site preparation, concrete slab, storage shed, electrical work, lighting, exhaust fan, and gear rack system, with a total cost of $61,176.71. The project is a single-transaction award with a detailed scope of work and quality requirements. The award was made on April 22, 2025, and involves comprehensive construction services for the specified fire station.

Description

Purchase order issued for the coordination, procurement, permitting, and installation of the protective gear storage shed at Fire Station 36, in accordance with the quotation provided by High Standard Construction, Inc. on April 11, 2025. Project information & Location: Fire Station 36 Bunker Gear Shed Projects 12252 Winter Garden Vineland Road, Orlando, Florida 32836 High Standard Construction has submitted a proposal for the comprehensive construction project at Fire Station 36 located at 12252 Winter Garden Vineland Road, Orlando, Florida 32836. The project entails installing a new storage shed approximately 12' x 24, 3000 psi concrete slab with footer and rebar per specs, interior lighting with a switch activated LED truss mounted strip light, installation of exhaust fan and installation of gear rack system. Scope of Work: * Project Management * Concrete 3000 psi * Lumber for forms * Rebar #5 * Storage Shed 12' x 24' * 120v Circuit * Exhaust Fan * Interior Lighting * Speed Control Switch * Gear Rack System * Add a new electrical circuit for shed with small sub-pane High Standard Construction, Inc., will provide all necessary materials and equipment for the project and will ensure that only top-quality products are used to achieve the desired results. The total cost for the construction project is estimated at $61,176.71. This includes all materials, labor, equipment, and overhead expenses. Any additional costs arising from unforeseen circumstances will be discuss