# Kern County 2406952

All labor, materials, and equipment required to perform repairs for elevator #3 PASS per the scope below, in accordan...

**Recipient:** ThyssenKrupp Elevator Corp

**Award Amount:** $47,487.10
**Ceiling:** $47,487.10

**Awarded:** December 04, 2023

**Identifier:** 2406952

Kern County awarded ThyssenKrupp Elevator Corp a single purchase order for labor, materials, and equipment to recondition the motor for elevator #3 at the Public Service Building, under Price Agreement 782. The work includes dismantling, cleaning, and inspecting the motor; electrical winding, pole-drop, and armature tests; resin treatment and baking; turning and undercutting the armature; balancing rotating parts; repairing machine fits; installing bearings and brushes; adjusting brush holders; final testing and recording voltage, current, and vibration; and painting and preparing the motor for shipment. The scope notes excessive carbon buildup requiring extra cleaning. Changes to quoted work require approval; if changes are not accepted, the motor will be returned and actual labor and material costs invoiced. The order lists labor at $26,836.59, parts and materials at $19,012.83, tax at $1,637.68, and a total of $47,487.10. Quantity: 1.

### Description

All labor, materials, and equipment required to perform repairs for elevator #3 PASS per the scope below, in accordance with Price Agreement 782. Scope of Work DC Recondition Work Scope: Dismantle, clean and inspect. Electrically test windings with Baker AWA. Perform run test if possible, pole drop test, meg brush holders and bar-to-bar test armature. Steam clean all parts. Resin treat windings and bake. Turn and undercut armature. Balance all rotating parts. Repair machine fits to spec as needed. Install new bearings. Clean and adjust brush holders. Replace brushes with new. Assemble and perform final AWA then test run motor. Seat brushes. Record all data including voltage, current and overall vibration. Once testing is completed, paint and prep for shipment. Any changes in work scope on quoted jobs will be submitted for approval before proceeding with work. If changes are not accepted, motor will be returned and actual hours and materials in job will be invoiced. Excessive carbon build up, extra cleaning needed. 1650.7304-18 ----- Public Service Building Labor: $26,836.59 Parts/Material: $19,012.83 Tax: $1,637.68 Total: $47,487.10
