# Kern County 2406869

Scope of Work: Office Repaint Inclusions: 1. Patch and repair all drywall surfaces prior to paint. 2. Spot prime all ...

**Recipient:** Sweaney Inc

**Award Amount:** $2,220.00
**Ceiling:** $2,220.00

**Awarded:** November 15, 2023

**Identifier:** 2406869

Kern County awarded Sweaney Inc a single-transaction, $2,220 lump-sum order for office repainting (quantity 1). Work includes patching and repairing drywall, spot-priming bare and repaired areas, applying two coats of Sherwin-Williams ProMar 200 interior eggshell enamel to drywall, protecting adjacent surfaces, painting previously painted wood doors, matching existing colors, and cleanup and debris removal. Scaffolding and equipment are included. The lump sum includes labor ($1,808.65), materials ($380), sales tax ($31.35), insurance, and California prevailing wages. Temporary utilities, barriers, dumpsters and fees, project-specific training or certifications, moving contents, and work not specifically listed are excluded. Prices are stated to be valid for 30 days from the proposal date.

### Description

Scope of Work: Office Repaint Inclusions: 1. Patch and repair all drywall surfaces prior to paint. 2. Spot prime all bare and repaired areas. 3. Paint all drywall surfaces with two coats of Sherwin Williams Pro Mar 200 interior eggshell enamel. 4. Mask and protect all adjacent surfaces not receiving paint. 5. Paint all previously painted wood doors (one door to be painted one side and one door to be painted one side only). 6. Paint colors to match existing color scheme. 7. California State Prevailing Wage Rates 8. Clean up and haul off debris. 9. Scaffold & Equipment for Our Scope of Work. 10. Material and Labor Prices Good for 30 Days from the date of this Proposal. Exclusions: 1. Temporary Power, Lighting, and Water. 2. Temporary Barriers and Barricades. 3. Dumpsters and Associated Fees. 4. Project Specific Training Courses and Certifications. 5. Content Manipulation (all contents to be moved by other prior to paint). 6. ANY WORK NOT SPECIFICALLY LISTED IN INCLUSIONS. Base Bid Amount Labor: $1,808.65 Material: $380.00 Sales Tax: $31.35 Total: $2,220.00 Lump sum total includes all tax, insurance, and prevailing wage.
