Award
Los Angeles County Fire Department PO-FR-27006085
LABOR - ROOF REPAIR - PERFORM WORK PER SCOPE OF WORK PROVIDED BY PROJECT MANAGER SPEC#: LACOFD-0076-27 **COST NOT TO ...
Recipient
MASA CONTRACTING, INC.
Award Amount
$97,666.38
Ceiling
$97,666.38
Awarded
November 20, 2026
Identifier
PO-FR-27006085
Description
LABOR - ROOF REPAIR - PERFORM WORK PER SCOPE OF WORK PROVIDED BY PROJECT MANAGER SPEC#: LACOFD-0076-27 COST NOT TO EXCEED PO TOTAL ** --------------------------- FOR INTERNAL USE ONLY 68 #: B259826 UNIT CODE: 42201 OBJECT CODE: 3530, 2776 ME4 **CHANGE ORDER #01 Replace six (6) 1 x 6 x 8 boards. Replace three (3) rusted wind-driven turbine exhaust ventilators (whirlybirds). Install one (1) solar-powered roof ventilator, including the curb, on the apparatus bay. The following changes will be made to the commodity lines: LABOR - add $4,433.73 (increase from $62,593.93 to 67,027.66) MATERIALS - add $2,926.39 ($2,654.32 plus $272.07 tax at 10.25%) (increase from $25,135.90 to $27,790.22 plus tax) The total estimated cost, including tax $7,360.12; MATERIALS 68 #: B259826 FUND: 42201 C&M - PROJECT MGMT CONTACT: CESAR VELASQUEZ (213) 215-4010 CHANGE ORDER #01 Replace six (6) 1 x 6 x 8 boards. Replace three (3) rusted wind-driven turbine exhaust ventilators (whirlybirds). Install one (1) solar-powered roof ventilator, including the curb, on the apparatus bay. The following changes will be made to the commodity lines: LABOR - add $4,433.73 (increase from $62,593.93 to 67,027.66) MATERIALS - add $2,926.39 ($2,654.32 plus $272.07 tax at 10.25%) (increase from $25,135.90 to $27,790.22 plus tax) The total estimated cost, including tax $7,360.12