Award
Kentucky CGI Advantage 4 #RFP-785-2200000108-1
Design Build KSR Main Tower & Rotunda Protection
Recipient
Structural Systems Repair Group LLC
Award Amount
$614,324.00
Ceiling
$614,324.00
Awarded
December 09, 2021
Identifier
RFP-785-2200000108-1
The Kentucky Department of Engineering and Contract Administration awarded Structural Systems Repair Group LLC a contract for approximately $614,324 to design, calculate, produce architectural and engineering drawings, and install a comprehensive facade containment system on the Kentucky State Reformatory Main Tower Building and Rotunda Building. The project aims to protect personnel and structures from falling masonry debris by implementing safety measures outlined in the project scope and attached documentation.
Description
The project includes the design, preparation of all required calculations and architectural/engineering drawings, and the installation of a complete and comprehensive facade containment system for areas defined in the criteria documents on the existing Kentucky State Reformatory Main Tower Building and Rotunda Building. The facade containment system is intended to protect personnel and buildings in areas around the noted buildings from falling masonry debris.