Award
Kern County 2406642
All labor, material and equipment required to correct the sprinkler system deficiencies noted on the inspection repor...
Recipient
RLH Fire Protection
Award Amount
$7,706.00
Ceiling
$7,706.00
Awarded
October 11, 2023
Identifier
2406642
Kern County awarded RLH Fire Protection a $7,706 lump-sum purchase order for labor, materials, and equipment to correct sprinkler inspection deficiencies. Work includes replacing a missing second-floor standpipe hose valve cap; replacing missing E-2 escutcheons on the first and second floors; lowering a fire sprinkler in Court Room L; replacing two painted brass SR pendant sprinklers above the escalator and one in the third-floor women's restroom; and troubleshooting the common-area electric bell, with replacement of the bell and/or 6-inch waterflow switch as indicated by results. Scaffolding is included. The lump sum includes prevailing-wage labor, materials, equipment, tax, and insurance. Terms are governed only by Price Agreement 0965. The stated breakdown is $7,133 for labor and materials plus $573 tax.
Description
All labor, material and equipment required to correct the sprinkler system deficiencies noted on the inspection report dated 08/28/2023. Terms and conditions shall only be in accordance with Price Agreement 0965. Scope of work: Standpipe: Replace Missing Hose Valve Cap on 2nd Floor. First Floor: Replace (1) Missing White E-2 Escutcheon, and Lower Fire Sprinkler in Court Room L. Second Floor: Replace (1) Missing White E-2 Escutcheon in Court Room F. Replace (2) Painted 155 1/2" Brass SR Pendant Fire Sprinklers above Escalator. Please note that the price of a scaffolding is included in this proposal. Third Floor: Replace (1) Painted 155 1/2" Brass SR Pendant Fire Sprinkler in Woman's RR. (Door 3105) Common Area: Troubleshoot Electric Bell. Bell Failed to Operate During Inspection. Replace Electric Bell and/or 6" waterflow Switch based off troubleshooting results. Lump sum total includes all prevailing wage labor, materials, equipment, tax and insurance. Labor/Materials $7,133 Tax: $573.00 Total: $7,706.00