Award
City of Greenville #26-3995
City Streambank Restoration (2026)
Recipient
Wildlands Construction, LLC
Award Amount
$1,634,492.00
Ceiling
$1,634,492.00
Awarded
May 21, 2026
Identifier
26-3995
The City of Greenville, South Carolina, has awarded several contracts to Wildlands Construction, LLC, for streambank stabilization, ecological restoration, and invasive species management along the Reedy River and a tributary in the Greenville County area. The projects include the City Streambank Restoration (2026), Southernside Bank Stabilization, and additional related work, with a total obligated amount of approximately $1,634,492.32. The scope involves installing in-stream structures such as boulder toe protections, geolifts reinforced with Rolanka Bio-D blocks, rock cross vanes, log vanes, log sills, planting native vegetation, and implementing erosion and sediment control measures. The contracts specify detailed construction specifications, environmental protections, safety protocols, and coordination with utility and traffic management. The projects are located within Greenville, SC, with specific sites along the Reedy River and Southernside stream corridor. The awards include detailed line items for materials such as boulders, geolifts, erosion control matting, native plants, and structural elements, as well as services like engineering, surveying, and construction. The period of performance includes a 180-day construction window and a one-year warranty on materials and workmanship. The awards were finalized through an intent to award and bid tabulation, with the primary contractor being Wildlands Construction, LLC.
Description
The City of Greenville awarded a contract for streambank stabilization and enhancement activities along the Reedy River on City property, upstream of the Conestee Nature Preserve, including a bid alternate for stabilization along a tributary in the Southernside neighborhood north of Unity Park.